Construction of bridges and other complex structures around the world

Leader in the CIS
65 years of experience with no complaints
Thursday, 24 April, 14






Objects :: Companys Visiting cards

Companys Visiting cards

Over 5 thousand objects in Ukraine were totally built by companys bridge builders over 65 years.

They include all functioning bridges in Kyiv, bridges and crossovers in Dnipropetrovsk, Kherson, Mykolajiv region and other regions of Ukraine, over 1,1 thousand railroad bridges (total length - over 55 km), over 4 thousand highway bridges and crossovers with (total length of over 120 km).

Photographs of the most well-known construction projects built by Mostobud

Various orders fulfilled by the company:

  • Reconstruction of a railroad underbridge at 928 km, Lozovaya station, South Railway.

  • Reconstruction of a road junction - Prospekt Nauki and Stolichnoye Shosse in Holoseevskiy region, Kiev.

  • Bridge across the river Siverskii Donets, Dobropolie-Krasnyi liman (Donetsk region). Length 331,1m. Superstructure: continuous span, reinforced concrete, cast-in-place and precast with beams.

  • Bridge across the river Prut in the area of village Prut, village Ostritsa (side road  from Chernivtsi). Length 340,12 m. Superstructure: continuous span, reinforced concrete, cast-in-place and precast with beams.

  • Reconstruction of road junction Karavaevy Dachi. Bridges for allocation of sidewalks (Kyiv,Industrial str., st. Karavaevy Dachi). Length of Bridges - 276,95 m. Superstructure of reinforced concrete with T-beams.

  • Reconstruction, construction of crossover at the intersection of Krasnoi Kaliny avenue and railway track of Persekovka st. (Lviv). Length 36,45 m.  Superstructure: continuous span, reinforced concrete, cast-in-place and precast construction using double core blocks.

  • Expansion dam replacement on the Bridge n.a. Paton (Kiev). 6 expansion dams of overlapping type with sliding splayed stay were replaced.

  • Parking garage construction on request of Ministry of Transportation (Kyiv). Drilled pier foundation with diameter 1,5 m.

  • Pedestrian overpass (Kyiv, Stolichne highway). Metallic bridge superstructure in a form of arch overlapping the structure 44,7 m. Pedestrian passage - 2,5m.

  • Pedestrian overpass (Kyiv, Teligy str.). Metallic bridge superstructure in a form of a bending arch with a tight string piece overlapping the structure 40 m. Pedestrian passage - 3,0 m.

  • Pedestrian overpass (Kyiv, Teligy str.). Metallic bridge superstructure, length - 54,0 m. Box girder (main beam). Pedestrian passage - 3,0 m.

  • Pedestrian overpass (Kyiv, Moskovskyj ave. And Lajosha Gavro str.) Joint metallic bridge superstructure, length - 56,4 m. Box girder (main beam). Pedestrian passage - 3,0 m.

  • Pedestrian overpass (Kyiv). Metallic bridge superstructure, length - 47,0 m. Box girder (main beam) with height - 1,03 m. Pedestrian passage - 3,0 m.

  • Construction of an overhead crossing over rail track (Khmelnyts'kyj, Grushevskoho str.) Length 52,0 m.  Superstructure: continuous span, reinforced concrete with beams.

  • Construction of an overhead crossing over rail track on highway Novomirgorod V.Viska. Length 46,2 m. Superstructure: continuous span, reinforced concrete with beams.  

  • Overhaul of Kajdakskij bridge (Dnipropetrovsk). Expansion dam replacement..