
|
 |

Main projects of PJSC “Mostobud”


|
Podil Bridge crossover construction in Kyiv
Description:
Main characteristics :
- length - 7,5 km;
- automobile passage (6 traffic lanes, 3 in each direction, width – 3,5 m);
- distance from water surface to road surface on Dnieper River – 36 m, distance from the ground to road surface about 18 m;
- subway passage;
- Includes a bridge across harbor (600 m), bridge across Dnieper River (344 m), bridge across creek Desenka (300 m), bridge over Raduzhne Lake.
|


|
Construction of a highway across Dnieper River in Zaporizhzhja
Main characteristics:
- length - 9,5 km;
- automobile passage (6 traffic lanes, 3 in each direction), width - 38 m;
- Includes 2 bridges (a bridge across Dnieper River – 660 m, and a bridge across Old Dnieper – 340 m), 27 engineering constructions (passways, flyovers, road junctions)
|

|
 |
|
|
 |