Construction of bridges and other complex structures around the world

Leader in the CIS
65 years of experience with no complaints
Sunday, 5 February, 12






Objects

Main projects of PJSC “Mostobud”

Ðàñïå÷àòàòü


Podil Bridge crossover construction in Kyiv

Description:

Main characteristics : 

  • length - 7,5 km;
  • automobile passage (6 traffic lanes, 3 in each direction, width – 3,5 m);
  • distance from water surface to road surface on Dnieper River – 36 m, distance from the ground to road surface about 18 m;
  • subway passage;
  • Includes a bridge across harbor (600 m), bridge across Dnieper River (344 m), bridge across creek Desenka (300 m), bridge over Raduzhne Lake.


Construction of a highway across Dnieper River in Zaporizhzhja

Main characteristics:

  • length - 9,5 km;
  • automobile passage (6 traffic lanes, 3 in each direction), width - 38 m;
  • Includes 2 bridges (a bridge across Dnieper River – 660 m, and a bridge across Old Dnieper – 340 m), 27 engineering constructions (passways, flyovers, road junctions)


Construction of right bank flyover of Railroad-Motor bridgework across Dnieper River in Kyiv

Main characteristics:

  • length – 1100 ì;
  • railroad passage – 2 gauges;
  • automobile passage (6 traffic lanes, 3 in each direction).


Construction of a highway “Kharkiv-Simferopol’”

Work is carried out in such directions :

  • new construction (6 objects);
  • reconstruction (17 objects).