
New possibilities of the Ukrainian bridge development
"Chicago Review"
NICK STARR
02-08.12.2005
UKRAINIAN COMPANY "MOSTOBUD" IS A LEADER IN BRIDGE DEVELOPMENT
IN THE CIS COUNTRIES. FOR OVER 60 YEARS "MOSTOBUD" WORKS WITHOUT
CLAIMS ON THE LOCAL AND NATIONWIDE MARKETS. VLADIMIR PROVIDUS,
MAIN INVESTOR AND THE CHAIRMAN OF THE BOARD OF DIRECTORS OF THE
"MOSTOBUD", AND THE PRESIDENT OF "UKRMOSTOBUD CORPORATION",
TALKS ABOUT NEW OPPORTUNITIES THAT OPEN UP FOR THE UKRAINIAN
BRIDGE DEVELOPMENT.
BEING BASED ON VERY OWN AS
WELL AS INTERNATIONAL
EXPERIENCE
— Recently your company
celebrated 60th anniversary.
— In 1945 our company was formed
officially. Practically bridge
development brigades, that later united
under "Mostobud", were forming up
during the World War II. At that time
being a part of the active army forces
these brigades were setting the records
for the quality and time in which the
bridges were developed. For instance
in 1943, in 13 days they have built a
complicated bridge structure on the
water over the Dnepr River near Kiev
for the transport of heavy motorized
divisions and army. That was
accomplished in record times — 81,5
meters per day. During that time, the
American leaders of bridge
development were building bridges 1.5
times slower. Besides our brigades were
working under constant enemy fire…
Thus, people who laid the base for the
"Mostobud" company were able to
successfully operate under tremendous
stress and pressure… Such quality of
work became a tradition and was
developed further by Isaac Barenboim,
the first leader of the company. Later
generations of our employees were
acquiring the same energy. I can say
that today’s craftsmanship is practically
genetic for our employees.
— What makes "Mostobud" the
leader on the post Soviet territories?
— We were the leaders even back in
the Soviet times. After the crash of the
USSR, the company had found itself in
the fairly comfortable position as
oppose to other companies. We have
maintained a strong engeneering and
development departments that earlier
services the entire terriotories of
Ukrain and Moldova as well as adjacent
Russian territories.
I want to emphasize our R&D
department, which is lead by one of the
best specialists in the world Michael
Korneev. Mr. Korneev prior to joining
"Mostobud" worked as a lead engineer
in the company that built bridges in
Turkey, near Ankara. He was also lead
engineer on many important and
complicated bridge development
projects all over the former USSR.
Highly professional personnel with
advanced techniques and the software
with especially complex calculations
allow designers to carry out equipment
quickly and to offer new and unusual
bridge designs of any complexity. The
department is licensed to develop any
bridge projects in the Ukraine and
Russian, as well as can operate under
the codes in EU and USA. Experts
agree that our abilities in developing and building bridges are equal to,
and in some exceeding the potential
of leading Western European
companies.
Flexibility of the eleven mobile
development teams along with all
necessary equipment, and being
located all over Ukraine, allows to
rapidly deploy and concentrate on
the most important aspects as well as
moving to between various
development projects.
"Mostobud" is well known beyond
Ukraine. There are numerous
operational sites developed by
"Mostobud" in Russia, Afghanistan,
Vietnam, Angola, Lebanon, Turkey,
Syria, Finland and Czech Republic.
There are also numerous contracts
pending for the development of
bridges in other countries.
Evidence of the skills of ours
employees is clear, they are often
offered to sign contracts for work
abroad. The company is proud of it,
but we are not interested in losing
our best experts to more favorable
foreign conditions. Therefore we
provide workers with the highest
wages in branch and practically same
monthly premiums. Besides the
extensive package of social programs
which are exceeding privileges
typical for Ukraine as well as bonuses.
To be honest with you, we prefer to
go abroad in order to possibly learn
new cutting.edge technologies.
Although Ukrainian bridge
development has been known since the
times of the USSR, our company is
gaining respect by the new school.
Today we are working on
establishing relationships on the
worldwide market. I am certain that our
formula of "price.quality" will attract
the attention of potential partners from
many countries.
NEW TECHNOLOGIES, MODERN
EQUIPMENT
— Are you aware that in the
Ukraine there aren’t any major
projects in works?
— It is not so. Ukraine is very well
located strategically, at the crossroads of
many transit ways. On its territory there
are four major Pan.European transport
corridors. And as you may know there
are no roads without bridge
constructions. Therefore we are
involved in many projects within
Ukraine. It is not by chance that new
bridge development is positioned as
one of the priorities in economical
growth of the country.
"Mostobud" is actively participating
in practical solutions to the logistical
problems, deliveries of merchandise,
and other things to the correct
destination in timely manner. With
that, the quality of the transport should
be of that such is asked for.
It is estimated that transport costs are
approximately one/third of the end
price on the merchandise. Therefore,
saving on transportation is important
even on the government level. The
conditions of the highways plays a key
role in that. We are responsible for
mainly bridges over water and other
barriers, crossroad construction,
underground tunnels and others.
Again, our expertise allows us to
compete on the worldwide market.
— Five years ago "Mostobud" was
though to have serious issues.
— Yes, there was a time like that. It has
passed though. The issues had a
legitimate reason – unstable economical
situation in the country, which just
became independent, on the way to
democracy. However, there were also
some issues that had to do with previous
management of the company.
In 2003, when new investors came
into play with the modern vision and
expertise in such complex business as
bridge development, the company had
started growing and became very stable.
It is enough to mention that in 2005
we’re planning on completing 10 times
the workload that we had in 2002.
Considering the growth of the company
and that there are just days left until
the end of the year, we are managing
just fine under such pressure.
From day one, our investors began
reachi9ng out to new technologies and
acquiring new modern equipment. In
just 3 years we were able to triple the
revenues and net income. With all that
we can see that the new investors are
here to stay, and have long term goals.
Let me tell you about one such
example that may be interesting to the
foreign readers.
Currently we have purchased a
special floating elevating crane with
carrying capacity up to 1200 tons. It is
unique in the sense that now we will
not have to build bridges by pieces.
The bridges will be compiled right on
the shore. Then the special crane will
pick it up and put it in place over the
water. Like in a fairy tale: yesterday
there was no bridge but today there
is one! This technology speeds up
the process and improves the quality.
Not one company in the CIS has
such crane. Besides, a deposit of not
loaded crane — is less than 1 meter, it
will consist of several independent
modules — all this will allow moving
it on shoaliness, through bottlenecks
of the rivers and any sluices. The
most complicated load.lifting device
will be put together easily, and can
pass under any bridges. Crane
operators will perform the work, and
will operatively move to new object.
As a result, base characteristics of
any bridge object — reliability and
durability considerably go up. In
many respects it will be provided by
competently executed calculations
of endurance of connections and
elements of the bridge, and also that
new technological conditions will
allow to embody most adequately
engineering ideas with original
design. It would seem as only the
elevating crane. But it has changed
not only technology, but also strategy
of the bridge development..
Such crane can provide all bridge
development projects on Dnepr and
other rivers of Ukraine. Knowing
about this purchase, Russians as well
as other foreign customers are
already negotiating with us
regarding future projects.
— Where and when are you
planning on trying out this cutting
edge technology?
— By the summer of 2006, during the
development of major highway over
Dnepr River into Zaporozhiye. We’re
planning to use it as soon as we get it to
put together major components of the
future bridge. We also have some major
plans and goals that I hope will put our
company on the map in the world as
leaders of the bridge development.
We’re open for new contacts and
relationships. We’re doing everything
so that the relationships with our
partners are mutually beneficial.
NICK STARR,
Kiev, Ukraine
November 25th, 2005 |